Beech Road Reconstruction (Savko & Sons)

Water Work:
Base bid water work consisted of the installation of 7200 LF of 30” ductile iron pipe transmission main and associate valves and appurtenances. The cost of this work was approximately $2,420,000. A bid alternate was selected to begin the installation of the Ganton East Wishbone which consisted of 1700 LF of 16” ductile iron pipe transmission main and associated valves and appurtenances. The bid alternate cost was roughly $158,000.00. Additional water work was added to the contract for simplicity of construction, this extra work consisted of approximately 3000 LF of 36” ductile iron pipe transmission main and associated valves and appurtenances along the proposed Beech Road. The approximate cost of this work was $1,000,000.00.

Sanitary Sewer:
Base bid work included phases 1 and 2 of the Worthington Road Subtrunk Sewer. Phase 1 consisted of 3700 LF of 30” PVC and 1400 LF of 8” and 10” PVC Force Main. These improvements cost approximately $1,070,000.00. Phase 2 consisted of 3500 LF of 24” PVC pipe costing approximately $520,000.

Roadway:
Roadway work consisted of the realignment and reconstruction of approximately 9000 LF of existing Beech Road and 1800 LF of Ganton Parkway. Incidental to these roadway improvements were storm sewer, new street lighting, reconfiguration of an existing traffic signal, shared-use asphalt path, new splitter islands with landscaping, telecommunications duct bank and the addition of a bike lane. The roadway improvements portion of the Beech Road project cost roughly $10,000,000.00.

Blacklick Creek Trunk Sewer Part 2A-1 (Trucco Construction)

Project Description:rnThe BCTS-2A-1 project consisted of furnishing all labor, material and equipment for the construction of approximately 8,600 linear feet 48-inch gravity sewer and other related items including site work. The total cost of this project was approximately $6,200,000.00.rnrnGeneral Alignment:rnThis sewer runs from North of Morse Road in Franklin County, East towards Avis Road and North along Avis. Roughly halfway along the Avis Road alignment the sewer takes a turn East towards Babbit Road. The termination of this point of the sewer is just West of Babbit Road.

Blacklick Creek Trunk Sewer Part 2B/BCTS-3 (Complete General Construction)

Project Description:rnThis project consists of furnishing all labor, material and equipment for the construction of approximately 9,400 linear feet of 42-inch and 48-inch gravity sanitary sewer with multiple connections to existing sewers and other related items including site work for the base bid work associated with the Blacklick Creek Trunk Sewer (BCTS) Part 2B. BCTS-3 continues the main sewer alignment to the North for roughly 3000 LF of 42” plastic pipe with other smaller sewer branches consisting of 36” plastic pipe. The cost for both projects is expected to be roughly $12,800,00.00.rnrnGeneral Alignment:rnPart 2B picked up where 2A-2 left off just West of the county line. The alignment continues North for several thousand feet then turns East towards the county line. The sewer then continues North along the county line crossing SR-161, Smith’s Mill Road and terminating just North of Innovation Campus Way West. Part 3 picks up at the terminus of Part 2B, continuing North along the County Line. The sewer then terminates at the junction of Jug Street and Central College Road.

Kitzmiller Water Booster Station (Ulliman Schutte)

Project Description:rnThis project consisted of furnishing all labor, material and equipment for the construction of a water booster station including pump & valve installation, mechanical equipment, water main work and other related items including site work. This station is utilized to pressurize the New Albany Water Pressure District which encompasses much of the water transmission main installed as a part of the Beech Road reconstruction project. The water booster station project cost roughly $3,250,000.00.

Jug Street Water Booster Station (Howell Contractors)

Project Description:rnThis project consisted of furnishing all labor, material and equipment for the construction of a water booster station including pump & valve installation, mechanical equipment, water main work and other related items including site work. This station will be utilized to pressurize the Mink Water Pressure District which encompasses much of the water transmission main installed as a part of the Mink Pressure District Water Main project. A water tower will be constructed in the future to unlock the full capabilities of this Booster Station. The water booster station project cost roughly $3,200,000.00.

Mink Pressure District Water Main/Innovation Campus Way Water Main Extension (Trucco Construction)

Project Description:rnThis project consisted of furnishing all labor, material and equipment for the construction of approximately 6,800 feet of 24-Inch and 2,600 feet of 16-inch ductile iron water main and associated appurtenances along Beech Road, Jug Street and Harrison Road. This water main tied into the Jug Street water booster station to establish the beginnings of the Mink Water Pressure District. The cost of this project was approximately $2,300,000.00. Additional work was added to this project for ease of construction which consisted of roughly 2000 LF of 12” ductile iron pipe water main and associated valves and appurtenances along Innovation Campus Way East. The cost of the water main extension was roughly $400,000.00.

Harrison Rd Storm Improvements (Trucco Construction)

Project Description:rnThis project was awarded to Trucco Construction along with the Mink Pressure District Water Main and 12” Innovation Campus Way water main extension. The storm improvements consisted of approximately 3,500-feet of storm sewer ranging in size from 12- to 24-inch installed along Harrison Road. This project cost roughly $500,000.00.

Innovation Campus Way West (Savko & Sons)

Project Description:rnThis project consisted of constructing approximately 3000 lineal feet of new roadway construction extending Innovation Campus Way to the West. This project included asphalt and concrete pavement, curb, storm sewer, street lighting, traffic control devices, grading, and seeding. The overall cost was roughly $1,930,000.00.

Ganton Parkway East, Phase 2/Ganton Parkway West, Phase 1 (Savko & Sons)

Project Description:rnGanton Parkway East Phase 2 includes widening and resurfacing of Ganton Parkway from Worthington Road to a point 2,200 feet south of Worthington Road. Ganton Parkway West Phase 1 includes new road construction from Beech Road to a point 2,200 feet west and widening of Beech Road for a turn lane. Both include roller compacted concrete base, storm sewer, water main, street lighting, street trees, utility duct banks, traffic control signage and striping, and a traffic signal at the intersection of Ganton Parkway and Beech Road. The total cost of these projects is roughly $6,200,000.00.

Worthington Road Sanitary Subtrunk Extension, Phase 1 (Complete General Construction)

Project Description:rnThis project consists of the installation of roughly 2000 LF of 30” PVC sanitary sewer and associated appurtenances along Worthington Rd. The expected cost of this project is roughly $1,800,000.00.